There are two electrical shutdowns scheduled with Met-Ed for the Wallach Sports Performance and Lacrosse project:

  • Thurs., Nov. 21 from 9 a.m. to 2 p.m.
  • Wed., Nov. 27 from 9 a.m. to 2 p.m.

All of Metzgar Fields will be without power during these shutdowns.

Submitted by: Emily Papp