Several small repairs are being made as the result of a structural analysis that found the structure to be safe, but also recommended a few actions be taken as a precautionary measure. The deck is open during the work. Replacement of the deck was deferred as part of the College’s cost-reduction measures in response to COVID-19.

Leave a Reply

Your email address will not be published.

You may use basic HTML tags and attributes.